ElipCo executed the structural and architectural turnkey contract for the infrastructure system at Cibao Factory, Suoi Tre IP, Dong Nai (VND 24.8 Billion). Built to heavy-duty industrial standards.

General Project Information:
Project Name: Infrastructure System – Cibao Co., Ltd.
Location: N5 Street, Suoi Tre Industrial Park, Long Khanh City, Dong Nai Province
Client / Investor: Cibao Co., Ltd.
Scope of Contract: Main Contractor for Structural Works & Architectural Finishing
Contract Value: VND 24.8 Billion
Construction Duration: 08 months
Execution Period: 2015 – 2016
Contractor: Elip Co., Ltd. (ElipCo)
Detailed Project Description:
The Infrastructure System – Cibao Co., Ltd. project involves the complete implementation of synchronized technical infrastructure supporting the Cibao manufacturing complex in Suoi Tre Industrial Park, Dong Nai Province. The project serves as the operational backbone, providing heavy-duty transportation, drainage, and landscape integration.
Key Infrastructure Components:
Internal Road Network: Heavy-duty asphalt/reinforced concrete roads designed for container traffic, complete with sidewalks and traffic signaling.
Water Supply & Drainage Network: Stormwater drainage channels, reinforced concrete sewage pipelines, septic tanks, and connection to the centralized wastewater treatment facility.
Technical Utility Trenches & Landscaping: Inspection manholes, underground cable ducts, boundary walls, and industrial green landscaping.
Structural Engineering & Technical Details:
Road Base & Subgrade: Crushed stone aggregate sub-base paired with high-grade concrete pavement engineered for maximum axle load resistance.
Drainage Culverts & Manholes: Precast and cast-in-place reinforced concrete pipe and box culverts designed for high-capacity flow management.